Please Note: The following drawings are for a 4 bedroom detached luxury dwelling to be built on our site. The Full Planning Permission was PASSED. However, it is currently LAPSED. Outline Planning Approval still exists for the construction of of a detached dwelling. Prospective purchasers are able to have their own design created and bespoke to their needs.
Below is a copy of the Site Plan As Draw Up By The Architects & Original Site Onwerwhich now has enduring Outline Planning Permission for a newbuild detached 4 bedroom house at our property: Seabreezes, Munro Place, Bettyhill, Thurso, Sutherland, KW14 7TD.
Developer’s Measurement Plan – Given In Good Faith
Please Note: To AVOID CONFUSION with the numbered houses and similarly numbered plots, all in Munro Place, a precaution of naming this plot “Seabreezes” has been made. This should ensure that there is NO accidental confusion between our building plot and any houses nearby with the same address numbers as the newbuild plot numbers.
Please Click Directly On The Image Above To Increase Viewing Size
This plan is what forms the official Title Deed as now registered at the Scottish Land Registry. Further detail and access to the complete Scottish Land Registry Title Deed from our solicitors. The title is Feuhold [Scottish Freehold equivalent] and is the best quality of title ownership available in Scotland.
If/when you visit the building site please follow the newly constructed access road from Munro Place. This is the road area coloured yellow on the plans of the Local Authority and are those that the original site developer, Mr Jappy purchased and which forms the direct connection from the existing Local Authority “adopted” road, namely Munro Place. This now connects directly to our new site road right up to our FULLY SERVICED Building Plot at Seabreezes. At the time of writing the overall site developer, Mr Jappy had reached sufficient progress with electricity, water, drainage, pavement, street-lighting on the site as to be released from the Local Authority Bond, following from which will shortly be the “adoption” of our site development spur by the Roads Department, and normalisation of use by homeowners, visitors etc., to our Building Plot. Mr Jappy is holding off laying the final tarmacaddam until ALL of the underground services have been completely installed. This is in order to save new and fresh tarmac being dug up again shortly after being finished. The intention being to avoid needless potholes and road surface scarring to the finished development.
Here is a copy of the keenly IMPORTANT document which gives formal consent for OUTLINE PLANNING PERMISSION to build a detached house on the Building Plot: Seabreezes, Munro Place, Bettyhill, By Thurso, Sutherland, KW14 7TD …
Highland Council Planning Permission – OUTLINE PLANNING PERMISSION
Live & Enduring Planning Consent
Please Click Directly On The Image Above To Increase Viewing Size
The original OUTLINE PLANNING PERMISSION was formally granted on 19th March 2008. For the sake of good form it is important to note key aspects relating to Planning Permissions.
In this case there is wording that the “development to which it relates must be begun not later than the expiration of five years beginning with the date of this permission”.
For the sake of good form, we have now had direct confirmation from the Highland Council Planning Authority Case Officer, Mr Bob Robertson that as a “Material Operation” had begun on the main site well WITHIN the five year period, then in terms of the Town and Country Planning (Scotland) Act 1997, the OUTLINE PLANNING PERMISSION had begun and therefore was now enduring. For the avoidance of doubt, as this project had commenced and been progressed to a sufficient degree – major roadbuilding, pavement construction, street lighting and site full service connection etc – the OUTLINE PLANNING PERMISSION we have on site and including our Building Plot is now “live in perpetuity”.
That means the Planning Permission to build a detached house on our site is permanent and now just awaits the submission of the new owner’s DETAILED plans for that house in order to move to the next stage of this process and obtain a FULL PLANNING PERMISSION and requisite BUILDING WARRANTS to proceed with the actual newbuild.
For the actual statutory legislation on the “Meaningful Start” element which secures an enduring OUTLINE PLANNING PERMISSION, please be guided to:
Town and Country Planning (Scotland) Act 1997
“Meaningful Start” – For Definitive Statute – Click Here
It is also worth reminding possible buyers of our Building Plot that there was previously a FULL PLANNING PERMISSION for this site…
These lapsed around September 2013 and are NO LONGER live on a FUll basis [though OUTLINE Planning Permission is still alive]. But an application to reinstate this detailed and FULL PLANNING PERMISSION can be made if a new buyer wishes to reinstate this design. The original architects – Knight & McDonald – have been very kind and helpful. They are more than happy to resubmit the drawings and FULL PLANNING PERMISSION paperwork for a new owner to the Highland Council if the new owner would like the house as originally designed for the plot to be the actual newbuild for this site.
Though of course, a new owner may wish to have their own dedicated house design submitted for the FULL and DETAILED part of this process.
———————————————————————————————————-
Highland Council Planning List Notes …
Ref Number: 07/00429/FULSU Application Type Full Application
Validation Date: 25/10/2007 Grid Reference 270514 961777
Approval Date: 19/03/2008.
Description of Works Formation of 7 No. serviced building plots with associated access road.
Location of Works: Land West of Munro Place, Bettyhill, Thurso, Sutherland, KW14 7TD.
Plus provision of land within the adjacent site for affordable housing units.
Applicant Name: Mr I Jappy
Applicant Address: The Steading, Bettyhill, Thurso, KW14 7SP
Case Officer: Bob Robertson – Tel: 01862 812044.
Case Officer Email: bob.robertson [at] highland.gov.uk
Please replace [at] with the symbol @ when retyping Mr Robertson’s email. This helps stop internet email spammers hoovering up email addresses and spamming the recipient. Thankyou.
For completeness and to assist with due diligence, we show links to the official Highland Council – Sutherland Local Plan As Adopted 2010 …
Highland Council – Adopted Local Plan 2010
This can be seen on the ADOPTED Highland Council Local Plan Map …
Highland Council Local Plan Delineating Newbuild Homes On Our Site
Our Building Plot at Seabreezes appear within the curtilege of the Highland Council plan drawing marked “H1″ specifically for the development on greenfield land to the west of Munro Place of newbuild detached houses. The detailed plan specifies what is know as a 1.5 storey house style to fit in with the local vernacular. Examples of this 1.5 storey style appear courtesy of a local housebuilder – Roy Homes Ltd. This housebuilder has experience of over 1,000 newbuild homes and is well regarded in the area.
An EXAMPLE of a 1.5 Storey House can be seen here …
This drawing is Copyright (c) Roy Homes Ltd (2015). All Rights reserved.
“Bute” 1.5 Storey Design Custom Kit Home.
Roy Homes – “Bute” Style of House: Specification – Click Here
This drawing is Copyright (c) Roy Homes Ltd (2015). All Rights reserved.
”Bute” 1.5 Storey Design Custom Kit Home.
This drawing is Copyright (c) Roy Homes Ltd (2015). All Rights reserved.
“Bute” 1.5 Storey Design Custom Kit Home.
This drawing is Copyright (c) Roy Homes Ltd (2015). All Rights reserved.
“Bute” Plan Drawing – Ground Floor.
This drawing is Copyright (c) Roy Homes Ltd (2015). All Rights reserved.
“Bute” Plan Drawing – First Floor.
…. and also on the housebuilder’s 1.5 storey kit-house menu of designs …
Roy Homes – 1.5 Storey House Range Of Styles
Hopefully the above examples and weblinks give an idea of what is meant in the Local Plan design brief of a 1.5 Storey House, and also the style and vernacular that is being sought.
We would strongly recommend prospective purchasers for our Building Plot contact the appropriate architect or design and build company for guidance and advice. For your own specific and dedicated requirements to be drawn up into a design that is suitable for submission at the detailed FULL PLANNING PERMISSION part of the newbuild process …
Knight & McDonald Architects, 14 Beinn Ratha Court, Reay, Thurso, KW14 7RH.
Or …
If you would like to go the Kit House Custom Build with an established style of design off-the-peg ..
Roy Homes Ltd., 8 Lotland Street, Inverness, IV1 1PA.
Telephone : 01463 713838.
Roy Homes Contact Page – Please Click Here
—————————————————————————————
Highland Council – Sutherland Local Plan As Adopted 2010
Close-Up Of The Planning Department & Council Local Plan …
Highland Council Local Plan Approving Newbuild Homes On Our Site
Highland Council Local Plan – Designated Plan Colours & Keys
Highland Council Local Plan – Planning Narrative
————————————————–
Any questions, please feel free to email us and we shall do our best to answer …
Seabreezes Building Plot For Sale – Contact Page
________________________________________________________
The main site developer, Mr Ian Jappy has secured the requisite “Access Strip” of roadway from the Highland Council leading off of Munro Place, Bettyhill, and onto the site for which the Highland Council have granted Outline Planning Permission for the Development to proceed.
Title Plan Excerpt Illistrating Access Road Link To Main Housebuilding Site
The specific piece of roadway linking the public road at Munro Place to the soon to be adopted site developer roadway is marked on the Title Plan shown above coloured in yellow.
The works being undertaken at the access road can be seen in the following photograph taken in 2009 …
Access Road Link To Main Housebuilding Site – 2009
[WITHIN The “Meaningful Start” Planning Permission Period]
This illustrates the major roadway construction, which had to be to the required standard under Highland Council supervision, and in preparation for formal adoption by the Local Authority. Further photographs show the roadway nearing completion, just awaiting for final tarmacadam surfacing.
Access Roadway Nearing Completion Westward View – 2013
Access Roadway Nearing Completion Eastward View – 2014